Stories and articles about our latest projects, announcements and updates
Aragatsotn marz was equipped with another solar plant, this time with a capacity of 30.52 kW, which will save 2.3 million drams annually. It was installed in just two weeks and is built with 545 W Longi Solar panels.
A few days ago, the opening ceremony of the largest rooftop photovoltaic station in Armenia took place. The solar stations belonging to the “Elite Shant” Group of Companies have a total photovoltaic capacity of about 1.3 MW, which makes them the largest rooftop PV installation in Armenia, located in the same geolocation. Total area of […]
The station annually produces electricity equivalent to 𝟒𝟎 million AMD. 𝟓𝟓𝟗,𝟕 kW photovoltaic (DC) power and 500 kW inverter (AC) power was installed.
The station has become a reality due to complex engineering solutions․ Different parts of the roofs, as you can see, have different slopes, which in the absence of appropriate technical solutions could lead to a significant reduction in productivity.
SHTIGEN GROUP launched “Sunrise in Artsakh” project in April 2022 to establish energetic independence in Artsakh. SHTIGEN GROUP made the first donation itself, installing 12 solar water heaters on the house roofs of families whose relatives were murdered, became disabled, or the family has many children. Those families will always have free hot water for several decades.
“Solar” cycling race, victory over oil, virtual tour in Artsakh, gifts and knowledge that “shape” the future. All of these was presented at 𝐒𝐇𝐓𝐈𝐆𝐄𝐍 𝐆𝐑𝐎𝐔𝐏’s “booth of the future” at 𝐒𝐓𝐀𝐑𝐌𝐔𝐒 science camp.
Shtigen Group and Telcell signed a memorandum today, starting cooperation within the framework of the Sunrise in Artsakh project. The goal of the project is to establish energy independence and security in Artsakh by using solar energy.
Arevik children’s medical association of Stepanakert will no longer be deprived of hot water in case of gas and electricity supply failures. 8 solar water heaters with a capacity of 300 liters have been installed on the roof of the hospital.
Installation of 12 solar water heaters provided by the Shtigen Group in Artsakh was completed. The project was implemented within the framework of the Sunrise in Artsakh project, which was initiated by the Shtigen Group, a group of companies specializing in the sector of the latest energy.
The goal of the Sunrise in Artsakh project is to establish energy independence in Artsakh by using solar energy.
Just one month after signing the memorandum between Shtigen Group and the National Agrarian University of Armenia, the parties already have the first result of the cooperation. Shtigen Academy educational project, launched back in 2018, will also operate for students and graduates of the Agrarian University.