The solar plant was commissioned in 2019.
The power of 2MW takes about 4 hectares installed.
The annual production of the plant is 3.7 GWh.
The solar plant was commissioned in 2019.
The power of 2MW takes about 4 hectares installed.
The annual production of the plant is 3.7 GWh.
Location
Kotayk ProvinceType
Utility ScalePower
2MWPrevious Post
Next Post