The solar plant was commissioned in 2019.
The power of 2MW takes about 4 hectares installed.
The annual production of the plant is 3.7 GWh.
https://shtigen.com/en/blog/the-largest-commercial-pv-project-in-armenia-is-completed/
The solar plant was commissioned in 2019.
The power of 2MW takes about 4 hectares installed.
The annual production of the plant is 3.7 GWh.
https://shtigen.com/en/blog/the-largest-commercial-pv-project-in-armenia-is-completed/
Location
Kotayk ProvinceType
Utility ScalePower
2MWPrevious Post