The solar plant was commissioned in 2018 for International Masis Tabak LLC.
It allows to save AMD 72mln annually.
The power of 1MW takes about 1.7 hectares installed.
The solar plant was commissioned in 2018 for International Masis Tabak LLC.
It allows to save AMD 72mln annually.
Location
Ararat ProvinceType
Utility ScalePower
1MWPrevious Post
Next Post