Վերակագնվող և Արևային էներգիայի Լուծումներ | SHTIGEN

For Home Use

Free electricity, hot water and energy-saving heating for your home or apartment

For Your Business

Energy saving for business of all sizes, increase of competitiveness and profitability using the sun

Services

Service

We provide after-warranty service of our systems as well as the systems installed by others

Cleaning

Its recommended to clean the solar panels once a year or more often if the place is dusty

Invest in solar

Create a low-risk source of guaranteed stable income which will do for more than 20 years!

Call for information about Shtigen inventory

Search 100+ replacements parts, tools and items

Not sure which product will match your needs?

Use our calculator or call us to find out.

Projects

176.09 kW Solar Plant Installed at Platinum Stone Factory in Yerevan

This 176.09 kW solar plant installed by Shtigen generates approximately 258,000 kWh of electricity annually, enabling Platinum Stone to save 13.5 million AMD in the same period. Learn more about the installation here.

May 7, 2025

‘ARABKIR’ Medical Center

  The solar plant was commissioned in 2019․ It allows to save AMD 14mln annually.

August 6, 2020

ArSun Utility Scale PV Plant

  The solar plant was commissioned in 2019. The power of 2MW takes about 4 hectares installed. The annual production of the plant is 3.7 GWh. https://shtigen.com/en/blog/the-largest-commercial-pv-project-in-armenia-is-completed/

April 9, 2020

From our blog

Solar Sector Representatives Propose Creating a Specialized Group to Jointly Address Industry Challenges to the Government

Legislative changes in the solar sector could have serious consequences for the development of the industry, the country’s energy stability, and Armenia’s overall economy, stated the leaders of the country’s leading solar companies today.

June 24, 2025

“The Severe and Dangerous Consequences of Legislative Changes in the Solar Sector on Industry Development and Armenia’s Economy”

“The Severe and Dangerous Consequences of Legislative Changes in the Solar Sector on Industry Development and Armenia’s Economy” Energy transition is not a future ambition but a present necessity. Armenia has taken the first step, and now we must accelerate our efforts by acting smarter and with purpose. Through this series of posts, I will […]

June 17, 2025

Solar Plant Powers Platinum Stone Factory in Yerevan with 176 kW System

At the Platinum Stone factory operating in Yerevan, stones are cut by machines that run continuously. This is a highly energy-intensive process, as high-power equipment operates for hours with almost no interruption. To ensure proper 24/7 operation of the factory and significantly reduce electricity costs, the factory management turned to us for a solution. In […]

May 7, 2025