The solar plant was commissioned in 2019.
It allows to save AMD28mln annually.
Area-2240m².
The solar plant was commissioned in 2019.
It allows to save AMD28mln annually.
Location
Armavir ProvinceType
Manufacturing sectorPower
400KWPrevious Post
Next Post