The solar plant was commissioned in 2019.
It allows to save AMD 12mln annually.
The solar plant was commissioned in 2019.
It allows to save AMD 12mln annually.
Location
Kotayk ProvinceType
Manufacturing sectorPower
180kWPrevious Post
Next Post