The solar plant was commissioned in 2018.
It allows to save AMD 35mln annually.
Area-8424m².
The solar plant was commissioned in 2018.
It allows to save AMD 35mln annually.
Location
Armavir ProvinceType
Manufacturing sectorPower
500KWPrevious Post
Next Post