The solar plant was commissioned in 2019.
It allows to save AMD 5mln annually.
The solar plant was commissioned in 2019.
It allows to save AMD 5mln annually.
Location
Shirak ProvinceType
Manufacturing sectorPower
40 kWPrevious Post
Next Post