The solar plant was commissioned in 2018.
It allows to save AMD 40․5mln annually.
The solar plant was commissioned in 2018.
It allows to save AMD 40․5mln annually.
Location
Ararat ProvinceType
Manufacturing sectorPower
580KWPrevious Post
Next Post