The solar plant was commissioned in 2019․
It allows to save AMD32mln annually.
The solar plant was commissioned in 2019․
It allows to save AMD32mln annually.
Location
Armavir ProvinceType
Manufacturing sectorPower
500KWPrevious Post
Next Post